What Your Boss Would Like to Know About Project Network Diagrams | Lucidchart Blog
Reading time: about 4 min
Posted by: Lucid Content Team
Project network diagrams are the magical flowcharts that every project manager should know and love. As opposed to communicating a project plan with lengthy blocks of text, project network diagrams allow PMs to summarize their plans in one visual that can be easily digested and understood. When combined with the Critical Path Method (CPM), project network diagrams also help determine how long a project will take and which tasks will be the most important to complete on time.
Intrigued? Read on to learn more about project network diagrams and how to make them in Lucidchart.
If you’re already an expert, build a project management timeline now.
Must-know details about project network diagrams
First, project network diagrams and work breakdown structures (WBS) are sisters that always get mistaken as twins. They are not the same thing. While a WBS divides project deliverables into manageable pieces, a project network diagram takes those pieces and/or the tasks required to complete them and organizes them chronologically. In short, a work breakdown structure shows a whole and its parts while a project network diagram shows a sequence of events.
Because project network diagrams show chronology, PMs always draw them left to right, like reading a book.
The powers that be recognize two formats for drawing project network diagrams. The first format, activity on node, shows an event as a box, also known as a node. Arrows connect events together to show sequence. The second format, activity on arrow, shows events on the arrows that connect nodes. Of the two formats, diagrammers typically use activity on node over activity on arrow.
Other names for a project network diagram include project management network diagram, project flow diagram, project flow chart, project management flow chart, and project management process flow chart. “A rose by any other name would smell as sweet,” and project network diagrams by any other name are still fantastic productivity tools. Try our work breakdown structure (WBS) software today.
How to build a project network diagram
Project network diagrams are indeed magical, but they don’t build themselves. These steps should get you started.
1. Start with a predecessor table.
You might be thinking, “Woah! I thought this was about network diagrams, not tables!” Don’t worry—it is. Predecessor tables list all of the tasks in your project along with their immediate predecessors, tasks one must complete before starting another task. With this information, your network diagram will fall right into place.
Suppose you want to make lasagna. This could be your predecessor table (built in Lucidchart, of course):
2. Build the flowchart.
Drag a process box onto your canvas and label it “Start.” Then, lay down boxes for each of the tasks that does not have an immediate predecessor, tasks 1, 3, and 5. These will connect to the start box. Task 2 comes immediately after task 1, so put them close together and connect them. Continue to do this until all of your tasks have been charted and connected. As you build, remember that project network diagrams are read from left to right. Your flowchart will look something like this when you finish: